Ebenezer Assifuah: I'm not behind schedule to succeed in Europe

Published on: 28 February 2015
Ebenezer Assifuah: I'm not behind schedule to succeed in Europe
Ebenezer Assifuah

 

FC Sion’s promising Ghanaian striker Ebenezer Assifuah insists he is on course for the season despite spending four months on the sidelines due to injury last year.

The 21-year-old suffered a tendon problem which restricted him to four matches before the winter break.

Assifuah is expected to explode in Europe after winning the top scorer award at the 2013 FIFA U20 World Cup in Turkey.

Last season, he scored 7 goals in 24 matches in the Swiss Super League and was expected to better than this term but that look impossible due to the setback.

However, the former Liberty Professionals player is not throwing is hands up in despair.

“It was hard for me last year but I am still strong and I know I can achieve my target for the season,” Assifuah told Africanfootball.com

“I need know there is so pressure for me to be a top striker and I’m capable for doing. Hopefully by the end of the season, the statistics will be high.”

He trained with the Ghana squad in Accra but could not make the final squad to the just ended 2015 Africa Cup of Nations.

Comments

  • Yaw
    says: 11 years ago
    Yes he trained with the black stars in Ghana before their camping in Spain. He missed the end of their season and but even played in thier last 2 matches which were around November.
  • Assisi
    says: 11 years ago
    Did he actually trained with the Ghana squad for Afcon 2015? Why wasn't that reported here? Again, if he has been injured for the last four months and has not been playing for F C Sion, how could he have trained with the B/S team in order to be selected for the AFCON 2015? The story doesn't add up GSN.